| Here it is with a frozen clutch and varnish for fuel |
 | Rear view |
 | Rack and pinion steering and front disc brakes on a 65? Very progressive! |
 | Once the seats and carpet were removed, we found very little rust. Very suprising! |
 | Cleanup and painting of motor has begun |
 | Front disc brake rotors have been turned |
 | Front disc brake calipers are being rebuilt |
 | Front rotors are installed. |
 | Rebuilt brake and clutch master cylinders have been bled and installed. |
 | Right front suspension and brake line are being finished. |
 | Left rear brake shoes and hardware are being assembled. |
 | Left front suspension and brakes are being assembled. Brake line from master cylinder has also been installed. |
 | Rear brakes and suspension have been buttoned up |
 | Engine compartment after engine removal |
 | Motor has been reunited with the transmission after a new clutch assy with a throwout bearing have been installed. |
 | Engine and transmission on their way in |
 | Engine and transmission installed |
 | Fuel pump and heater valve installed |
 | Carburetors overhauled and installed |
 | Fuel pump line to carburetor fabricated and installed. New oil filter installed |
| Engine compartment is just about wrapped up. |
 | Hood is being repaired and welded |
 | We have fabricated a new floor |
 | The left rocker panel has been removed, patched the inner rocker and reinstalled the outer panel |
 | Left door metal work has begun |
 | Hood has been primed and is now being block sanded |
 | Doors have been primed and are awaiting block sanding |
 | Battery box is being removed since it is rotted |
| | |
| | |
| | |